Construction Programming and Cost Control – A Case Study of a leading Irish contractor

Brian Doherty

    Research output: Types of ThesisMaster's Thesis

    6 Downloads (Pure)
    Original languageEnglish
    Awarding Institution
    • Waterford Institute of Technology
    Supervisors/Advisors
    • Graham, Brian, Supervisor
    Publication statusSubmitted - 2010

    Cite this