Abstract
Construction unknowingly plans for poor levels of productivity with substantial waste, inefficiency, and rework stemming from a proliferation of non-value adding activities embedded within traditional delivery processes. This approach negatively influences construction’s economic and environmental sustainability. Last Planner® System (LPS) is a key tool of Lean Construction (LC) and is lauded as a value-add process that prioritises flow efficiency by addressing workflow variability and waste elimination on construction projects. This research evaluates how the presence of a dedicated knowledgeable and competent LPS Facilitator, enabling a complete LPS implementation, contributes to improved construction flow, efficiency, and productivity. The study adopted a mixed-methods approach utilising case study design and data collected from a literature review, site observation diary, site documentation analysis, and semi-structured interviews. Limitations exist around small survey size, lack of generalisability, and potential bias of researchers. Findings posit considerable productivity increase; more reliable, predictable, and stable workflow; enhanced team collaboration; as well as accrual of safety, quality, cost, and schedule benefits. Embedding a knowledgeable and competent LPS Facilitator appears to assist successful implementation of LPS with sectoral and societal value-add opportunities.
| Original language | English |
|---|---|
| Pages (from-to) | 142-158 |
| Number of pages | 17 |
| Journal | Construction Economics and Building |
| Volume | 21 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - 10 Sep 2021 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 8 Decent Work and Economic Growth
Keywords
- Collaboration
- Facilitator
- Last Planner System
- Lean Construction
- Mindset
Fingerprint
Dive into the research topics of 'Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver